Find A PhysicianHome  |  Library  |  myDownstate  |  Newsroom  |  A-Z Guide  |  E-mail  |  Contact Us  |  Directions
curve gif

SUNY Downstate Medical Center

Facilities Management & Development

image

Welcome to the FM&D Website

Our Departmental Profile

The Facilities Management and Development Department at SUNY Downstate Medical Center is comprised of a diverse group of multitalented individuals with backgrounds ranging in Architectural, Mechanical, Electrical Design, Project Management, Code Compliance, Environmental Health and Safety, and Building Services. Our highly diverse background is a major reason why our department is uniquely qualified to handle requests for services internally. Our main office is located in the Basic Science Building room1-15.

Our Responsibility

Facilities Management & Development is responsible for the overall maintenance and operation of all SUNY Downstate Medical Center buildings and grounds which totals in excess of 2,500,000 gross square feet. The department is subdivided into four primary divisions:Physical Plant, Design and Construction, Environmental Health & Safety.

Our Mission

We take tremendous pride in continuously maintaining the highest standards possible in providing a safe, comfortable, and clean environment for all staff, students, patients, and faculty at the SUNY Downstate Medical Center.

Campus Construction Activity Updates:
9-25-17

  • 14496-01 BSB Stacks Replacement Project
    • Planned scheduled shutdowns of Laboratory Fume hoods in several areas of the BSB continue. Please contact your Department Staff administrator for the schedule of affected areas. The contractor also anticipates delivering materials in the early-morning hours this week through BSB Elevator 17.
  • 14496-00 BSB Air Handler Upgrade/ DLAR
    • The contractor will proceed with concrete placement up in the 9th floor BSB Penthouse area on Saturday September 30th. A free path-of-travel will be required in the Basement level of the BSB to allow the transporting concrete from the Receiving Courtyard Loading dock area to Elevator 17.
  • 14B17 Boiler Replacement Project
    • The Contractor continues to work with heavy equipment in the areaway along the Receiving ramp. Decommissioning of the existing Boiler equipment will begin this week.
  • 14A91 PHAB/NAB Project
    • The Contractor is planning to remove the site fence along Clarkson Ave towards the end of this week.

logo

Follow the State University Construction Fund Facebook page to view SUNY Downstate Construction Projects, as well as other current projects throughout the SUNY University System.



Vision

  • Excellent service to the Campus community
  • Excellent stewardship of the campus environment
  • Professional and effective communication
  • High standards for professional and personal accountability
  • Sustainable development and management of campus resources

Goals

  • Develop methods for campus communications on facilities projects and deferred maintenance problems and issues.
  • Enhance tools to track, measure and report on facilities management for this Campus.
  • Improve the project delivery system within Design and Construction Unit and associated support services.
  • Enhance the safety of the Plant Utility area, staff properly per regulations, reducing staff burnout.
  • Define proper facilities staffing for an institution of this size complexity and niche service ( peer institutions and assoc.)
  • Ensure staff are properly trained, have tools, equipment and operating systems to perform work efficiently and effectively to meet the mission and goals of the Campus.